Interest FREE Loan in UAE 1500 Salary – Personal loan without interest in UAE
0% Personal Loan in UAE, Dubai, personal loan in uae 4000 salary, emirates nbd loan minimum salary
Urgent requirement of Planning Technician for Trags Trading Company, Qatar –
Primary Purpose of Job:
Provides Work Order planning, schedules and reports for QP refinery routine maintenance using various project planning
software and CMMS (SAP) in order to maximize the asset reliability.
Principle / Key Responsibilities:
Receiving, logging and processing of all maintenance requests (Notifications), ensuring conformance with the latest
revision of the maintenance work order.
Review and analyse maintenance Work Request and ensures that all the information are correct and complete. Plans and
check the required resources, materials, etc. in liaison with respective engineers before a Work Order is planned and
executed.
Ensure correct job priority as per equipment criticality & system condition in co‐ ordination with operations and liaise with
respective maintenance engineers.
Prepare draft maintenance work specification and task list including discipline man‐ hour; duration and special resources
requirement for plan scope of work. Entails visits to sites, liaising with maintenance, operation, and facilities personnel.
Responsible to verify notification completion, work order completion with details of accounting information (man‐
hours/materials utilized) and technical information (work carried out, fault diagnosed, failure code and failure mode).
Utilizes extensive knowledge of craft skills and knowledge of the equipment involved and places job steps in the proper
sequence to ensure efficient completion of work to meet operational requirement.
Check and provide required sub work orders for support services like Rigging, scaffolding, Insulation etc., to coincide with the
work order scheduling.
Co‐ordinate all day‐to‐day maintenance work carried out by Mechanical, Electrical, Instruments & Facilities disciplines for
effective and timely execution of the work in order to maximum usage of resources.
Operate proprietary planning software (Primavera, MS Project) to develop schedule.
Maintain various hard copy and electronic files covering all planning related works in professional manner.
Develop Eight weeks look ahead plans.
Participates along with the area Planning Engineer in the Weekly/Schedule Coordination Meeting and presents
the Weekly Schedule of workable maintenance jobs from the backlog. Ensures that a clear understanding exists of
which jobs will be worked in the upcoming week. Finalizes the Weekly Schedule for Operations.
Manage the status of work control and backlog for work order submission to work order completion. Status may include
waiting for planning, waiting parts, ready to schedule, etc.
Manage a backlog of work orders, which require major or significant portion of the facility to be shutdown.
Develop Eight Weeks Look Ahead plans and Resource Histograms in order to forecast the required resources.
Prepare various KPI reports: Planning compliance, Scheduling compliance, Job priority, Backlog compliance and
Resource utilization
Prepare weekly schedules and circulate to all concerned
Prepare In‐progress jobs reports.
Provide support to prepare unplanned shutdown schedules and create related work orders for all activities as per task list
Prepare various plans, schedule, reports etc. for department as & when required.